
Armour 2K Structure Paint
Two-component coating for chemical, petrochemical & industrial structures
Our 2K system is built for acid direct contact applications, offering the strength of a self-priming, two-component formulation with dependable curing in 4 hours. It delivers excellent resistance to acids, alkalis, and water, ensuring long-term performance in harsh industrial zones. With strong adhesion to all metal and non-metal surfaces (except rubber) and 50 sq.ft/kg coverage, 2K provides a powerful and efficient protective solution for demanding environments.
- Self-priming two-component system
- Touch dry in 1 hours
- Recoating time in 4 hours
- Superior acid, alkali & water resistance
Color Range
Overview
Usage
- Applied on all metal and non-metal structures except rubber.
- Protective coating against acid, alkali, UV resistant, and water resistant in aggressive industrial environments.
- Used in both dip-side and vapour-side areas across chemical and industrial facilities.
Advantages
- Two-component — mixing required
- Self-primer — eliminates separate priming step
- Touch drying in 1 hour for fast throughput
- Recoating time in 4 hours
- Superior resistance to acids, alkalis, UV, and water
- Excellent adhesion to all metal and non-metal surfaces (except rubber)
- High coverage rate — 50sq.ft per kg
Packaging
Applications
Pickling, ARP (Acid Recycling Plant), Lattice Tower, Galvanized wire, Paper mills, ETP, STP, Chemical plants, Petrochemical, SMS, Galvanizing facilities
Product Details
| Chemical | Max. Conc. |
|---|---|
| HCl | 35% |
| H₂SO₄ | 50% |
| HNO₃ | 50% |
| H₃PO₄ | 83% |
| HF | 40% |
| Acetic Acid | 99% |
| KOH | 30% |
| NaOH | 30% |
- Solvent-free, low VOC — environmentally responsible
- Safe for use in ETP and STP facilities
Application
ARMOUR 2K can be applied by brush, roller, or airless spray. No thinning is required. Apply in ambient temperature between 10 °C and 40 °C with relative humidity below 85%. Do not apply on wet surfaces or when rain is expected within 4 hours.
Minimum 2 coats recommended for all industrial environments.
- 1
Surface Preparation
Clean the surface thoroughly — remove rust, oil, grease, dust, and loose particles. Abrade to Sa 2.5 (blast) or St 3 (hand tool). Ensure surface is dry and free from contamination.
- 2
Application Method
Apply by brush, roller, or airless spray. For best results on porous surfaces, apply a thin first coat and allow to flash off before applying the second coat.
- 3
First Coat
Apply ARMOUR 2K uniformly at 100 microns DFT. Touch dry in 1 hour at 25 °C. Allow minimum 4 hours before applying subsequent coats.
- 4
Second Coat
Apply second coat at the same DFT. Ensure full coverage with no pinholes or holidays. Allow 6 Hours for full chemical cure before exposing to aggressive media.